Project - bridge deck runoff
2022-10-08 23:39:09 # Research

In this project (2022.7-2022.12), we studied the bridge deck runoff and the pollutants. The drainage system was also optimized using SWMM. An automatic modeling method was developed.

bridge model
bridge model

Prev
2022-10-08 23:39:09 # Research
Next